thursdays at 10.30, UIBK, StudioZwei and on ZOOM ID: 526 229 0223
🌸️ E2 ON BUILDING
design, branding, logistics
list of blogs
RELIGION google drive
🌸🌸
3*2 TEAMS
🌸🌸
DESIGN
overall design
structural drawings
execution drawings
concrete foundation formwork
scaffolds and materials estimation
ZZZ Vincent Reinhardt, Maximilian v. Strachwitz, Rosanna Meininger
task1:
Drawings: structure + overall
Wood construction
Column design
golden roof via logistics
Miroboard setup+link
WWW Felix Murken, Julia Gasse, Carlo Spadaro
task1:
Scaling of project
Wood construction > ask money via logistics
Drawings: structure + overall
Miroboard setup+link
🌸🌸
BRANDING
overall documentation
exhibition preparation
story + presentation
marketing + drawings
design of graphics
fine detail
statues, drawings, textile
video txt instagram
ZZZ Sophia Mertelseder, Finn Rothmann, Filip Bernát
task1:
prepare graphics for inside of pavilion + details for textile > to logistics https://www.tuchler.net/
samples for textiles
names, cover image, text
elements for inside rammed earth
WWW Cora Nill, Mara Ruperti, Angela Ballheimer, Lilly Schneider
task1:
prepare graphics for inside of pavilion + details for textile > to logistics https://www.tuchler.net/
samples for textiles
names, cover image, text
elements for inside rammed earth
🌸🌸
LOGISTICS
contact people in relation to design group
in contact with Bibi
money table
time logistics > time + materials + people + space
organization of layers of rammed earth
rammed earth formwork
ZZZ Luis Meyer, Beyza Aksoy, Jonas Rachbauer
task1:
golden roof versions materilas offers
textile offers in relation to branding https://www.tuchler.net/
orginize drive for data
budget estimations
WWW Pia Miedtke, Vincent Devens, Leonard Bies
task1:
Wood construction > ask money in relation to design
textile offers in relation to branding https://www.tuchler.net/
orginize drive for data
budget estimations
🌸️ SCHEDULE
14. March - Finalize Location
21. March - Foundation Drawings
01. April - Foundation Start
22. April - start of rammed earth and wood (4weeks)
19. May - rammed earth done
20. May 3 - weeks wood
08. June - opening
🌸️ SCHEDULE
1. Do 07.03.2024 intro
2. Do 14.03.2024 Finalize Location
3. Do 21.03.2024
4. Do 11.04.2024
5. Do 18.04.2024
6. Do 25.04.2024
7. Do 02.05.2024
8. Do 16.05.2024
9. Do 23.05.2024
10. Do 06.06.2024
11. Do 13.06.2024
12. Do 20.06.2024
13. Do 27.06.2024